Elsewhere in this report we discussed the options of building a
2,900-square foot addition to house Staff Locker Rooms, Staff Dining
Room, and an addition to the Administrative Offices. We also discussed
another addition of 5,000-square feet to house the Medical Service
Offices, the Laundry, a Trash Room, a Mourning Room, and a Quiet Lounge.
Wing C contains 11,250-square feet of space which should easily be
able to house the 7,900-square feet of required space mentioned above.
The Medical Service Offices could essentially be placed in existing
one and two bed rooms with a minimal amount of renovation. This has the
added advantage of giving each office their own private toilet room.
The central core could be renovated into Staff Locker Rooms, and an
area near the Nurses’ Station could be opened up with skylights,
planters, and a sitting area.
The two 2-bed rooms or two or three of the 1-bed rooms near the
entrance to the wing could be converted to the Mourning and Quiet Lounge
area.
Several of the bedrooms could be gutted for a Staff Dining Room. Some
of the doors to the corridor could be closed. This area would also
contain vending machines and a kitchenette.
The northerly end of the wing could be renovated into the new Laundry
which could extend through the equipment closet into one or two of the
bedrooms on the easterly side of the wing, if necessary.
On the west side of this wing is the enclosed courtyard for the
Dementia Wing. We would suggest that the enclosure for this courtyard
terminate at gridline K. This would allow the northwesterly exit door of
Wing C to have free access to the outside and to the service road. An
exterior fenced-in trash container or enclosed metal shed could be
installed in this location instead of an indoor Trash Room.
Our estimated cost for this construction is $565,000.00, exclusive of
roofing, windows, and heating, ventilating and air-conditioning work,
which is covered elsewhere in this report.